Help ELMA CRM+

Configuring Deal Stages

To bind a process to a certain sales funnel stage:
  • create a new sales funnel in the Sales Funnel object or open an existing funnel for editing (fig. 1);
    Fig. 1. Sales funnel
  • open the required stage for editing, by clicking ;
  • in the opened dialog box, select the required process in the Process field (fig. 2). This list displays only those processes, that have a Deal type input variable;
    Fig. 2. Edit a stage dialog box. Process field
  • depending on the selected process, fill in the fields (fig. 3).
    Context Variable of Deal's Initial Stage – select the process context variable, which will receive the initial deal stage.
    Context Variable of Deal's New Stage – select the process context variable, which will receive the new deal stage.
    These variables must be specified in the Change Deal Stage activity settings.
    Instance Name - name of the instance, which will be used when starting the process.
    Fig. 3. Edit a stage dialog box
    After filling in all the required fields, click ОК.
    All the stages are configured in that manner. After configuring all the required stages, save the sales funnel.
  • connect the sales funnel to a particular deal type in the Deal Type object. To do so, select the required funnel in the Sales Funnel field of a Deal Type instance (fig. 4).
    Fig. 4. Deal type editing form. Sales funnel field
The process starts automatically, when you change the deal stage.
Copyright © 2006–2019 ELMA