New Approval Stage

 
This activity allows sending a document for approval to several users or groups of users, that are independent for each other. the route may have unlimited number of new stages. 
For example, document approval includes three formal independent stages:
In the process graphic model, the New Approval Stage activity must be bound with the Send for Approval Activity (which must be placed before the business role swimlane); or with the New Approval Sheet activity (which is normally used before the static or dynamic swimlanes). To bind these activities, use labels. Thus the New Approval Stage activity must be located between the operations Send for approval and Approval or between New Approval Sheet and Approval (depending on the swim lane type).
An example of the correct use of this operation is shown in Fig. 1:
Fig. 1. Using the New Approval Stage Activity

New Approval Stage Settings

To configure the activity, double-click on its shape on the graphic model. The settings window will open which has the Common  tab (fig. 2):
Fig. 2. New Approval Stage Activity. Common Tab
This tab is similar to the Common tab of the Approval Activity.