In ELMA you can check completion of several tasks at the same time.
To check completion of multiple tasks, go to the Completion Check section, check the required tasks (fig. 1) and click Completed.
|
Fig. 1. "Completion Check" section. Multiple task control
|
Confirm the action in the opened dialog box (fig. 2) by clicking Yes.
|
Fig. 2. Confirm completion of the selected tasks
|
Copyright © 2006–2019 ELMA