Help ELMA BPM Platform
×
Menu

Multiple Task Control


In ELMA you can check completion of several tasks at the same time.
To check completion of multiple tasks, go to the Completion Check section, check the required tasks (fig. 1) and click Completed.
Fig. 1. "Completion Check" section. Multiple task control
Confirm the action in the opened dialog box (fig. 2) by clicking Yes.
Fig. 2. Confirm completion of the selected tasks

Copyright © 2006–2019 ELMA