When
modeling processes, you can use special activities of the ELMA KPI application. You can find these activities on the
Graphic model tab, in the KPI Management unit on the left panel (fig. 1).
Fig. 1. Graphic model tab. KPI Management activities unit
Activities in this unit are divided into two groups:
2.
Collect Data – this unit displays the activities that can be used for
Data Collection
Approval
This activity creates a
performance matrix approval task in Web Application. It is recommended that you use this operation when you need a performance matrix to be approved by several users.
You can find this operation in the KPI Management unit, Performance Matrices group (fig. 2). You can use this activity only in a
dynamic or
static swimlane.
Fig. 2. Approval activity
Approval activity settings
To configure this activity, double click on it on the process
graphic model, or open its context menu and select Settings. The settings dialog box is shown in fig. 3.
Fig. 3. Approval activity settings
Description - you can enter a description of the activity in this field.
The context variable with a reference to a performance matrix – in this field you need to specify a context variable of the Performance Matrix type, which stores the required performance matrix. To create a new variable, click Add Variable next to the field.
Configuring outgoing connectors for this activity is similar to configuring outgoing connectors of the
Approval activity.
Change Status
Change Status activity is used for changing the
status of a performance matrix. This activity is not displayed in Web Application. Once the activity has been executed, the matrix status changes according to the activity's settings.
You can find this activity in the KPI Management unit, in the Performance Matrices group (fig. 4).
Fig. 4. Change Status activity
Change Status activity settings
Settings of this activity are similar to the Approval settings, however, it has an additional field - Performance Matrix Status (fig. 5).
Fig. 5. Change Status activity settings. Performance Matrix Status field
Performance Matrix Status – this parameter defines the status that will be set to the performance matrix as the result of the activity execution. To change the status, click Change Value; in the opened window (fig. 6) select the required status and click OK.
Fig. 6. Window for selecting a performance matrix status
Data Input
This activity creates a
task to enter values of specific KPIs in Web Application.
You can find this activity in the KPI Management unit in the Collect Data group (fig. 7). You can use this activity only in a dynamic or static swimlane.
Fig. 7. Data Input activity
Data Input activity settings
To configure this activity, double click on its name or open its context menu and select Settings. The settings window (fig. 8) consists of the following tabs:
-
-
-
-
-
-
-
Advanced. This tab is similar to the
Advanced of the
Task activity;
-
Policies. This tab is similar to the
Policies of the
Task activity.
Fig. 8. Data Input settings. Common tab
Common tab
An example of this tab is shown in fig. 8.
Name * — name of the activity, displayed in the user's task list, on the task form in Web Application, on the graphic model, in the process documentation and process policies.
Description — activity description, displayed on the task form in Web Application, in the process documentation and process policies.
KPI tab
On this tab (fig. 9), you can select and configure KPIs, whose values need to be entered.
Fig. 9. Data Input settings. KPI tab
This tab is similar to the KPI tab of the data collection
tasks.
Data Control
The Data Control activity creates a
task to control data logged in Web Application.
You can find this activity in the KPI Management unit in the Collect Data group (fig. 10). You can use this activity only in a dynamic and a static swimlanes.
Fig. 10. Data Control activity
The settings of the Data Control activity are similar to the settings of the Data Input activity.