On this tab (fig. 1), you can enable/disable time report limit on projects of this type ( time report limit ).
|
Fig. 1. Project type settings page. Time Report tab
|
Time Report Limit unit:
-
-
No – disable time report limit in projects. Any number of hours can be submitted on any occupation.
Submitting Time Reports unit:
-
-
No – allow submitting time report on tasks, which have a plan time report value. This option is selected by default.
Time Report Approver unit:
Copyright © 2006–2019 ELMA